国产一级按摩不卡播放,亚洲国产黄片观看,亚洲熟妇中文字幕欧美,久久无码中文字幕人妻,亚洲v欧美v日韩ⅴ国产v,国产精品亚洲五月天高清

首頁
產(chǎn)品
卓越 ? 易用 ? 可靠
視頻
讓中國物聯(lián)網(wǎng)領(lǐng)先世界
搜索
歷史搜索
搜索發(fā)現(xiàn)
HOME > SERVICE > Problem

AC0606 voltage and current calibration

2022-06-11 15:49:35| Source:網(wǎng)絡(luò)| views:| 0

1. The power supply of the equipment is normal, the measured current passes through the transformer coil, and the municipal power is connected to the voltage acquisition port. 

2. The current is preferably about 80% of the measuring range of the transformer coil, and the load to be measured can also be used for calibration. 

3. After the equipment communication is connected, open the modbus poll project for calibration.

  

modbus poll工程進(jìn)行校準(zhǔn)


  

modbus poll工程進(jìn)行校準(zhǔn) 數(shù)據(jù)顯示

4. Use the instrument to measure the voltage of the voltage acquisition port and the current through the transformer, and fill in the [standard source] project. 

4. After filling in the standard source, wait for 5S after filling in the calibration mode [171], observe whether the values of each voltage, current and power channel are correct, and if correct, the calibration is completed.

修改后觀察電流、電壓、頻率等內(nèi)容

5. After the equipment is powered on again, adjust the current to observe the linearity of the equipment, if the power factor is less than 0.5 or negative reverse connection transformer.


聯(lián)系銷售
銷售王經(jīng)理微信 銷售王經(jīng)理
微信公眾號 微信公眾號
服務(wù)熱線
400-6688-400
土默特左旗| 师宗县| 青冈县| 泰顺县| 永仁县| 板桥市| 淳安县| 芜湖县| 永德县| 沙湾县| 科尔| 涟水县| 招远市| 永寿县| 曲麻莱县| 黄石市| 嵊州市| 武乡县|